Problems in your neighbourhood
18 issues
Construction Issue at Harbourfront-CityPlace
Harbourfront-CityPlace, Toronto
Concrete truck blocking street
149 Hiawatha Road, Toronto
Sidewalk blocked by construction
Shaw Street
Sidewalk blockage construction site
225 Yonge Street, Toronto
Trail blocked by construction cones
Lake Shore Boulevard East
Open utility excavation on sidewalk
Albany Avenue, Toronto
Utility cut road repair site
62 Sabrina Drive, Willowridge-Martingrove-Richview, Toronto
Construction obstruction on sidewalk
629 Vaughan Road, Oakwood Village, Toronto
Active construction blocking roadway
1310 Warden Avenue, Wexford, Toronto
Road construction erosion mat defect
Military Trail, Toronto
Exposed erosion netting—tripping hazard
Military Trail, Toronto
Sidewalk excavation pit, unsafe
85 Lower Jarvis Street, Toronto