Pothole in Ward 9 — Davenport
4 pothole reported in Ward 9. 1 resolved (25.0%). Avg resolution: 1.4 days.
4
Total Reports
1
Open
1
Resolved
25.0%
Resolution Rate
Recent Reports
Large pothole with standing water
Resolved
May 09, 2026
Large pothole on Wallace Ave westbound
Pot hole westbound on Wallace
Acknowledged
Apr 20, 2026
Pothole in eastbound lane
Pothole EB lane
Acknowledged
Apr 19, 2026
Two potholes near Bloor bus stop on Symington
Two potholes on road. Northbound on Symington at Bloor bus stop.
Sent
Mar 21, 2026
Spot a pothole in Ward 9?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now