Past Toronto's published service standard
This report is 91 days old. The city's standard for Water Drainage is 1 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Paula Fletcher
Pottery Road, Toronto Toronto
Reported on Sat, Apr 4, 2026 at 4:00 PM · 3mo ago
Report Details
AI-generated, reviewed by reporter
A metal catch basin drainage apparatus is displaced and lying across the road surface near a concrete bridge approach on Pottery Road, blocking part of the roadway. The displaced structure creates a tripping hazard and potential drainage blockage, with the location near a marked bike lane increasing safety risk for cyclists. The assembly consists of a cylindrical metal component with white and dark metal brackets that were previously installed as part of the stormwater drainage system.
Community Updates
Did the city actually fix this, or just close the file? Come back and tell your neighbours what you see on the ground. Add a photo. Your update is what holds the city to its word.
Have you seen this issue?
Sign in to reportWard 14 · Toronto-Danforth
Nearby
Bus Stop
Broadview Ave At Hillside Dr
Bus Stop
Broadview Ave At Bater Ave
Park
Trca Lands ( 50)
Park
Don Valley Brick Works
Report History
Complete timeline of your report lifecycle
Report Submitted
Apr 04, 2026 at 4:00 PM
Email sent to City of Toronto
Apr 04, 2026 at 4:00 PM
Awaiting Response
Open for 3 months
Comments (0)
No comments yet. Log in to be the first.