Past Toronto's published service standard
This report is 45 days old. The city's standard for Pothole is 14 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Chris Moise
Large pothole on Yonge St
City service request (311)
Updated about 1 month ago
The lines below are from the City of Toronto's acknowledgement email. They are estimates from the city, not a guarantee of when the issue will be fixed on the ground.
6 Breadalbane Street, Toronto
Reported on Wed, Apr 8, 2026 at 5:41 PM · 1mo ago
Report Details
AI-generated, reviewed by reporter
One pothole approximately 2-3 feet wide and 1-2 feet deep is located at the street/curb transition at 6 Breadalbane Street, with missing asphalt and exposed granular base material. Debris and loose material are visible around the cavity edges, creating a serious tripping and vehicle damage hazard.
Community Updates
Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.
Have you seen this issue?
Sign in to reportWard 13 · Toronto Centre
Nearby
School
The Ymca Academy Secondary School
School
St Joseph's College School
Bus Stop
Yonge St At Wellesley St East Wellesley Station
Bus Stop
Yonge St At Grosvenor St
Park
Dr. Lillian Mcgregor Park
Report History
Complete timeline of your report lifecycle
Report Submitted
Apr 08, 2026 at 5:41 PM
Email sent to Toronto 311
Apr 08, 2026 at 5:42 PM
Awaiting Response
Open for about 2 months
Similar Reports
Unauthorized waste dumped in alley
St Luke Lane, Toronto
1mo ago
Severe Broken Sidewalk Sections
St Luke Lane, Toronto
1mo ago
Park debris and scattered garbage
St Luke Lane, Toronto
1mo ago
Standing water in bike lane
17 Wellesley Street West, Toronto
1mo ago
Abandoned cargo bicycle blocking sidewalk
32 Wellesley Street East, Church-Wellesley, Toronto
11d ago
Stained drainage grate, possible leak
497 Church Street, Church-Wellesley, Toronto
14d ago
Comments (0)
No comments yet. Log in to be the first.