Past Toronto's published service standard
This report is 17 days old. The city's standard for Pothole is 14 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Chris Moise
Cracked and deteriorated sidewalk
201 Yonge Street, Toronto
Reported on Tue, Apr 28, 2026 at 7:28 PM · 16d ago
Report Details
AI-generated, reviewed by reporter
Sidewalk at 201 Yonge Street shows extensive cracking, spalling, and deterioration with standing water pooling in damaged areas and rust-colored staining along cracks indicating possible reinforcement corrosion. The nearby catch basins average 75 years old, which may be contributing to drainage issues.
Community Updates
Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.
Have you seen this issue?
Sign in to reportWard 13 · Toronto Centre
Nearby
School
St Michael's Choir School Gymnasium Bldg
School
St Michael's Choir School Choral Bldg
Bus Stop
Queen Station Northbound Platform
Bus Stop
Yonge St At Shuter St
Park
Trinity Square
Report History
Complete timeline of your report lifecycle
Report Submitted
Apr 28, 2026 at 7:28 PM
Email sent to Toronto 311
Apr 28, 2026 at 7:29 PM
Awaiting Response
Open for 17 days
Similar Reports
Abandoned furniture on sidewalk
197 Yonge Street, Toronto
16d ago
Abandoned construction sign blocking sidewalk
197 Yonge Street, Toronto
16d ago
Cracked and broken sidewalk edge
202 Yonge Street, Toronto
16d ago
Damaged pavement near catch basin
202 Yonge Street, Toronto
16d ago
Illegal dumping on Yonge Street
225 Yonge Street, Toronto
8d ago
Sidewalk blockage construction site
225 Yonge Street, Toronto
13d ago
Comments (0)
No comments yet. Log in to be the first.