Past Toronto's published service standard
This report is 45 days old. The city's standard for Road Damage is 14 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Stephen Holyday
Sidewalk cracks and trip hazard
59 Lavington Drive, Willowridge-Martingrove-Richview, Toronto Toronto
Reported on Fri, May 8, 2026 at 2:48 PM · 1mo ago
Report Details
AI-generated, reviewed by reporter
The concrete sidewalk at 59 Lavington Drive has multiple diagonal and vertical cracks creating a visible trip hazard to pedestrians. The deep, well-defined cracks pose a particular risk to those with mobility aids or elderly residents.
Community Updates
Did the city actually fix this, or just close the file? Come back and tell your neighbours what you see on the ground. Add a photo. Your update is what holds the city to its word.
Have you seen this issue?
Sign in to reportWard 2 · Etobicoke Centre
Nearby
School
Transfiguration Of Our Lord Catholic Elementary School
School
Ecole Elementaire Felix Leclerc
Bus Stop
Martin Grove Rd At Waterbury Dr
Bus Stop
Martin Grove Rd At Waterbury Dr
Park
Martingrove Gardens Park
Report History
Complete timeline of your report lifecycle
Report Submitted
May 08, 2026 at 2:48 PM
Email sent to City of Toronto
May 08, 2026 at 2:48 PM
Awaiting Response
Open for about 2 months
Similar Reports
Cracked, spalling sidewalk
Lavington Drive
1mo ago
Cracked and spalling sidewalk
14 Ludstone Drive, Willowridge-Martingrove-Richview, Toronto
1mo ago
Failed utility patch with cracking
14 Ludstone Drive, Willowridge-Martingrove-Richview, Toronto
1mo ago
Sunken asphalt utility patch
14 Ludstone Drive, Willowridge-Martingrove-Richview, Toronto
1mo ago
Blocked sidewalk edge drainage
74 Lavington Drive, Toronto
2mo ago
Road surface cracks in asphalt
20 Ludstone Drive, Willowridge-Martingrove-Richview, Toronto
1mo ago
Comments (0)
No comments yet. Log in to be the first.