Past Toronto's published service standard
This report is 46 days old. The city's standard for Road Damage is 14 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Stephen Holyday
1 Hayhurst Road, Toronto
Reported on Wed, Mar 25, 2026 at 7:24 PM · 1mo ago
Report Details
AI-generated, reviewed by reporter
A deep vertical crack runs down the center of the asphalt at this location, with loose debris visible along the fissure indicating structural pavement failure likely from freeze-thaw cycles or subsidence. Extensive alligator cracking and displaced asphalt pieces across the intersection create uneven surfaces and tripping hazards for pedestrians and cyclists. The widespread deterioration requires immediate resurfacing to prevent further damage and safety risks.
Community Updates
Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.
1 community report
✗ Still there · Mar 29
Have you seen this issue?
Sign in to reportWard 2 · Etobicoke Centre
Nearby
Park
Blackfriar Park
School
Ecole Elementaire Felix Leclerc
Bus Stop
Kipling Ave At Hayhurst Rd
Report History
Complete timeline of your report lifecycle
Report Submitted
Mar 25, 2026 at 7:24 PM
Email sent to Toronto 311
Mar 25, 2026 at 7:54 PM
A community member reported: Still there
Mar 29, 2026 at 8:19 PM
Awaiting Response
Open for about 2 months
Similar Reports
Cracked sidewalk near Kipling Ave
Hayhurst Road
9d ago
Extensive road surface damage and settling
5 Moford Crescent, Willowridge-Martingrove-Richview, Toronto
2d ago
Large pothole with crumbling edges
2 Moford Crescent, Toronto
1mo ago
Deep longitudinal pavement crack
Kipling Avenue, Kingsview Village-The Westway, Toronto
1mo ago
Sunken road with alligator cracking
Sabrina Drive
2d ago
Severe asphalt cracking and spalling
18 Moford Crescent, Willowridge-Martingrove-Richview, Toronto
2d ago
Comments (0)
No comments yet. Log in to be the first.