Road Damage in Ward 8 — Eglinton-Lawrence
3 road damage reported in Ward 8. 1 resolved (33.3%). Avg resolution: 29.7 days.
3
Total Reports
2
Open
1
Resolved
33.3%
Resolution Rate
Recent Reports
Sunken catch basin, broken asphalt
Large pothole With asphalt pieces. Hazard for pedestrians and vehicles
Sent
Apr 26, 2026
Deteriorated Asphalt at Crosswalk
Road damage
Sent
Mar 24, 2026
Road depression/pothole in street surface
Huge pothole on avenue on road facing south
Resolved
Feb 24, 2026
Spot a road damage in Ward 8?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now