Road Damage in Ward 2 — Etobicoke Centre
19 road damage reported in Ward 2. 1 resolved (5.3%). Avg resolution: 7.8 days.
19
Total Reports
9
Open
1
Resolved
5.3%
Resolution Rate
Recent Reports
Cracked, spalling sidewalk
Sent
May 08, 2026
Sidewalk cracks and trip hazard
Acknowledged
May 08, 2026
Extensive road surface damage and settling
Acknowledged
May 08, 2026
Severe asphalt cracking and spalling
Acknowledged
May 08, 2026
Multiple potholes in residential street
Acknowledged
May 08, 2026
Long driveway crack pattern
Acknowledged
May 08, 2026
Road surface alligator cracking near curb
Acknowledged
May 08, 2026
Severe asphalt cracking on street
Sent
May 08, 2026
Deteriorated pedestrian crosswalk markings
Sent
May 08, 2026
Road surface cracks in asphalt
Ludstone and Arkley crescent
Acknowledged
May 08, 2026
Cracked and spalling sidewalk
Acknowledged
May 08, 2026
Sunken asphalt utility patch
Acknowledged
May 08, 2026
Spot a road damage in Ward 2?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now