Road Damage in Ward 1 — Etobicoke North
24 road damage reported in Ward 1. 7 resolved (29.2%). Avg resolution: 7.6 days.
24
Total Reports
12
Open
7
Resolved
29.2%
Resolution Rate
Recent Reports
Sunken utility cut patch, Martin Grove
Sent
May 01, 2026
Severe road damage and sinkhole
Sent
May 01, 2026
Road settlement near utility access
Acknowledged
May 01, 2026
Sunken asphalt patch on roadway
Acknowledged
May 01, 2026
Road cracking near catch basin
Resolved
May 01, 2026
Sunken asphalt and road cracks
Resolved
Apr 30, 2026
Sunken asphalt patch in road
Acknowledged
Apr 30, 2026
Extensive road surface cracking
Acknowledged
Apr 30, 2026
Road cracking at Martin Grove intersection
In the intersection of Martin Grove and Belfield
Sent
Apr 30, 2026
Major longitudinal road crack
Acknowledged
Apr 30, 2026
Extensive road surface cracking
Resolved
Apr 30, 2026
Cracked road with sunken utility patch
Resolved
Apr 30, 2026
Spot a road damage in Ward 1?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now