Road Damage in Ward 15 — Don Valley West
5 road damage reported in Ward 15. 1 resolved (20.0%).
5
Total Reports
4
Open
1
Resolved
20.0%
Resolution Rate
Recent Reports
Severe road cracking and deterioration
Sent
Apr 17, 2026
Road surface cracks and deterioration
Sent
Apr 17, 2026
Road surface deterioration Eglinton
Sent
Apr 17, 2026
Cracked road surface at intersection
Resolved
Apr 09, 2026
Highway left edge dent hazard
There is a huge dent on the left edge of the road.
Sent
Mar 24, 2026
Spot a road damage in Ward 15?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now